🔨Small Tasks/Enhancements
0 in development or testing0 queued3 in backlog1 paused or waiting2 closed in 30 days
- On hold APD-55 Instructor Portal - Request Assistance: In production since Sep 28. Waiting on Manjula to confirm the email changes; Alice wants her sign-off before this closes. Last chased Oct 1.
What it is
Short pieces of work that need tracking but aren't a project: a day or so each.
What's happening
The instructor portal request-assistance change (APD-55) is in production and marked Testing/Approval, but it's waiting on Manjula to confirm the email changes; Alice asked for that confirmation before it closes, and Ankit has been waiting on her reply since Oct 1. A distribution list change was done Oct 8. In backlog: raising the character limit on instructor special notes (High), replacing password-by-email on the partner and instructor portals with reset links, and always copying the MLS address on proposal emails.
Development issues
| APD-55 | Instructor Portal - Request Assistance | Testing/Approval | ARAnkit Kumar Rai | Low |
| APD-120 | Partner/Instructor Portal: replace password-by-email with reset links and user-set passwords | Backlog | Unassigned | |
| APD-124 | All trackers: always copy the MLS "Email From" address on proposal emails | Backlog | JPJohn Polec | |
| APD-70 | Increase character limit - Instructor - Special Notes section | Backlog | PHPradeep Hanumaiah | High |
| APD-119 | Distribution list changes | Done | PHPradeep Hanumaiah | Low |
| APD-56 | Remove Alice Sidorski from all Education Partner emails | Done | PHPradeep Hanumaiah | Low |